日本一区二区在线观看免费无毒不卡 |日韩欧精品亚洲一区二区三区cableav,2020高清无码淫荡视频,麻豆视频,好看的电影|日韩欧美国产精品视频二区|色av你懂的

NEWS CENTER
The thermal shock project of Sulzer passed the acceptance
Time:2021-05-19 Author: Number of views:1869

Recently, the thermal shock test project of the main feed water pump of the nuclear power plant that POWERFLOW Control Co., Ltd participated in the design and construction has been a complete success. The test results have won unanimous praise from the Sulzer and the end user.。

   
The thermal shock project was completed on the basis of the high temperature and high pressure boiler feed water pump test bench supplied to Sulzer in 2014 by our company. During the start of the test main pump, the water temperature rose rapidly from below 40°C to 185°C within 3s, and continued to run at this high temperature, far exceeding the established target of 15s. After on-site testing by our customer as well as the experts of the acceptance team, they unanimously agreed to pass the acceptance.

      
Sulzer founded in 1834, it is a global leader in pumps, surface treatment technology, chemical machinery, and turbine services. The successful cooperation with Sulzer again marks that POWERFLOW's nuclear pump testing capability has reached a new level. All our company employees will always adhere to the concept of seeking truth from facts and excellence, and continue to provide customers with first-class products and services.




Return list
Share to:
无锡市新吴区匠升职业技能培训学校有限公司 | 乌兰察布市科信电子产品销售有限公司 | 厦门势阱网络科技有限公司| 安徽海克斯科技发展有限公司 | 印江自治县腾宇艺术培训学校有限公司|